Material dispute · 260 MW · Ohio$750,000+ lost because nobody could prove who got the wire.
A difficult subcontractor kept claiming material was short. Without a digital request and transfer log, there was no chain of custody, and weeks of paperwork later the team found the sub had run the wrong cable specification across 17 arrays. The cost landed on the wrong side anyway.
How Meridian helpsEvery request, approval and transfer gets a timestamped record, so the answer to a dispute is minutes away, not weeks.
Equipment failure · Ohio · Tracker systemA failure nobody documented, so the next site got no warning.
Incorrect damper hardware was spinning loose and going through glass across several arrays. The investigation and repair happened from scratch and the lesson left with the project.
How Meridian helpsLessons and failure modes are captured as records and travel with your company to the next project.
Multi-site · Quality inconsistencyEvery site ran quality differently: Excel here, Smartsheet there, paper elsewhere.
Standardizing inspection formats and job book structure took months, and by the time it was done the next project had drifted again.
How Meridian helpsCompany-level templates that every project inherits make quality repeatable.